Project: Custume Barracks, Athlone

Custume Barracks, Athlone

Retaining wall reinforcement is typically one of the more labour and time-intensive elements of a groundworks programme, with steel fixed bar by bar and measurements and alterations to be made to each bar over multiple weeks. For this project in Athlone, our valued client Triur Construction needed a faster, safer alternative that didn't compromise on quality or programme certainty.

Midland Steel manufactured and installed the retaining wall reinforcement at out SMART factory, using Trimble based BIM modelling to ensure a precise fit before any modules left the factory. The pre-assembled sections were then delivered to site and lifted directly into position by crane. From the first lift to base mesh tied in, the full 47 metre run was installed in just a day and a half - a fraction of the time a traditional loose bar approach would typically require.

The Result

  • 75% faster installation versus traditional loose bar fixing
  • 80% reduction in manual handling on site
  • Minimised on-site waste, with reinforcement formed to spec offsite
  • Reduced time on a live site, lowering exposure to safety risk

Client

Triur Construction

Problem

Aggressive Time Deadlines and Difficult Conditions

Solution

Fasterfix Modular Retaining Wall 

Project Details

Each bar forensically detailed to reduce waste, on site injuries and to maximise labour efficiency. This project is a great example of the speed and efficiency of FasterFix as this project was completed in under 2 days with just 4 fixers!

 

Number of onsite Fixers

4

Tonnage

12 tonnes